Spain
Valencia
- Annual energy
- 192.6GWh
- Mean
- 22.0MW
- P95
- 32.1MW
Large, steady container base load with an evening ferry peak — power planning is driven by a high floor, not just the peak.
Discuss ValenciaModelled ports
Selected examples of ports preliminarily modelled using public call data; indicative estimates, not completed client engagements or endorsements.
Spain
Large, steady container base load with an evening ferry peak — power planning is driven by a high floor, not just the peak.
Discuss ValenciaSpain
A mixed fleet of container, ferry and tanker calls spreads demand across the day.
Discuss Las PalmasSpain
Cruise-driven daytime peaks: hourly peaks and phasing need as much attention as annual energy.
Discuss Palma de MallorcaSweden
Finland
Finland
How to read these figures. Annual energy is the shore power vessels at berth would draw over a year. Mean is the average hourly demand. P95 is the level not exceeded in 95% of hours — a planning threshold, not a grid design.
Scenario: 2025 · mid power · full adoption. Source: Bridge Power working model v0.2.1 (built 2026-11-10), modelled from public ship-call records. Vessel figures are category estimates, not measured energy or customer results. Ports are listed for illustration and are not ranked.