Approach

One connected plan for vessels, terminals and the grid.

Ports rarely fail on a single technology choice. They struggle when demand, infrastructure and commercial structure are planned separately. We work through them in sequence.

01

Vessel & OPS baseline and scenarios

Turn public and port call data into hourly onshore power supply (OPS) demand by vessel type and berth — then test adoption, vessel power, connection time and supply-capacity scenarios.

02

Incorporate the whole port

Bring in terminals, charging, equipment electrification, the grid connection and on-site generation as one connected system.

03

Optimise system & delivery

Test storage, tariffs, phasing and lifecycle cost — and compare ownership against concession or partnership structures.

Stage 1

Vessel & OPS baseline and scenarios

  • Vessel call patterns and berth occupancy
  • Hourly OPS demand by vessel segment and berth
  • Adoption, vessel-power, connection-time and supply-capacity scenarios
  • Regulatory drivers and timelines relevant to your port

Stage 2

Incorporate the whole port

  • Terminal operations and equipment electrification
  • Truck, vehicle and equipment charging
  • Grid connection capacity and on-site generation

Stage 3

Optimise system & delivery

  • Storage sizing and tariff strategy
  • Phasing and lifecycle cost
  • Ownership versus concession or partnership options

Three assessments

Each assessment is shaped around your port's own data and priorities.

Assessment 1

Vessel & OPS baseline

How much energy and power your berths need, when, for which vessels — and how that changes across adoption and capacity scenarios.

Assessment 2

Whole-port demand

Terminals, equipment and charging combined into one port-wide picture.

Assessment 3

System optimisation

The most practical mix of grid, generation, storage and phasing.

Start with your port's OPS baseline.

Name your port and the question you need answered. We'll suggest a sensible, scoped first step.